PERFORMANCE REQUIREMENTS AND TEST PROCEDURE TRR-2A AND TRR-3A BRIDGE BALANCING BOARDS,

Abstract

The specification includes requirements for construction, visual inspection, test equipment, tests, and tagging.

Document Details

Document Type
Technical Report
Publication Date
Oct 30, 1952
Accession Number
AD0658123

Entities

People

  • W. J. Mayo-wells

Organizations

  • Johns Hopkins University Applied Physics Laboratory

Tags

DTIC Thesaurus Topics

  • Construction
  • Construction Equipment
  • Cooperation
  • Inspection
  • Specifications
  • Test Equipment
  • Visual Inspection

Fields of Study

  • Physics