LASA SUBARRAY ELECTRONICS MODULE (SEM) TELEMETRY Q MODIFICATION (SEM MOD 20),

Abstract

SEM Mod 20 involved two major changes in the operation of the Subarray Electronics Module (SEM). First, a new Power Distribution and Control Drawer (PDC), Model II, provided for an expansion of the SEM telemetry command responses to a possible sixty-three commands. The report briefly describes the work effort of the Montana LASA Maintenance Center personnel in accomplishing the modification. This consisted of four principal functions: Preliminary work at Lincoln Laboratory, System evaluation at the LMC, Modification and Checkout at the LMC, and Field installation. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 10, 1967
Accession Number
AD0658180

Entities

People

  • H. L. Martin

Tags

Communities of Interest

  • Advanced Electronics
  • Human Systems

DTIC Thesaurus Topics

  • Buildings And Structures
  • Cooperation
  • Electronics
  • Electronics Laboratories
  • Maintenance
  • Maintenance Personnel
  • Massachusetts
  • Power Distribution
  • Research Facilities
  • Telemetry
  • Test And Evaluation

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Seismology
  • Software Engineering

Technology Areas

  • Microelectronics