THE FIRST CORE REPLACEMENT PM-3A NUCLEAR POWER PLANT, MCMURDO STATION, ANTARCTICA.

Abstract

Replacement of the first core at the PM-3A Nuclear Power Plant began on 21 November 1964, and was completed on 26 December 1964, with the plant reassembled for acceptance testing. The total elapsed time was 35 days. The report discusses the entire refueling operation including unexpected plant modifications which were necessary during this first refueling. Application of the lessons learned and experience gained from this core replacement together with adequate crew training should provide positive assurance of safe and efficient future fuelings of both PM-3A and PM-1. Based on the actual times for fueling operations, it is estimated that a future fueling could be accomplished in 8 days. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 17, 1965
Accession Number
AD0658233

Entities

People

  • Peter D. Arrowsmith

Tags

DTIC Thesaurus Topics

  • Antarctica
  • Lessons Learned
  • Nuclear Power Plants
  • Refueling
  • Training

Readers

  • Aerospace logistics and air mobility.
  • Electrical Engineering
  • Facility/Structural Engineering.