VENTILATION REQUIREMENTS FOR GAS-PROOFING TANKS OF THE M-4 SERIES,

Abstract

The purpose of the report is to determine the important leakage areas in the series M-4 tanks and the amount of sealing required to maintain adequate pressure for gas-proofing the tank with ventilation equipment of practical size and power consumption. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1943
Accession Number
AD0658571

Entities

People

  • R. H. Walpole
  • T. F. Hatch

Organizations

  • United States Army Medical Research Laboratory

Tags

DTIC Thesaurus Topics

  • Cooling
  • Cooling And Ventilating Equipment
  • Ducts
  • Energy Consumption
  • Ventilation

Readers

  • Materials Science
  • Systems Analysis and Design