VENTILATION REQUIREMENTS FOR GAS-PROOFING TANKS OF THE M-4 SERIES,
Abstract
The purpose of the report is to determine the important leakage areas in the series M-4 tanks and the amount of sealing required to maintain adequate pressure for gas-proofing the tank with ventilation equipment of practical size and power consumption. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1943
- Accession Number
- AD0658571
Entities
People
- R. H. Walpole
- T. F. Hatch
Organizations
- United States Army Medical Research Laboratory