AN ANALYSIS OF THE FAA RANGE INSTRUMENTATION AT NAFEC.

Abstract

Contents: Rapid data readout; Central data requirements; Timing system; Test planning procedures; Test planning lead time; Liaison; Systems evaluation; Equipment accuracy and area coverage; Project support capacity; Scheduling and preventive maintenance; Branch separation; Equipment engineering; Range engineering; Operation; Mixed personnel. A discussion is given of existing capacity, required capacity, operating standards and procedures, and measurements modernization program.

Document Details

Document Type
Technical Report
Publication Date
Feb 25, 1963
Accession Number
AD0658893

Entities

People

  • D. D. Steele
  • J. F. Reeves
  • J. H. Morgan
  • J. Smillie

Tags

DTIC Thesaurus Topics

  • Accuracy
  • Area Coverage
  • Engineering
  • Engineers
  • Instrumentation
  • Lead Time
  • Maintenance
  • Management Planning And Control
  • Measurement
  • Measuring Instruments
  • Preventive Maintenance
  • Scheduling (Production)

Fields of Study

  • Engineering

Readers

  • Aerospace Test and Evaluation
  • Aviation Safety and Air Traffic Management