AN ANALYSIS OF THE FAA RANGE INSTRUMENTATION AT NAFEC.
Abstract
Contents: Rapid data readout; Central data requirements; Timing system; Test planning procedures; Test planning lead time; Liaison; Systems evaluation; Equipment accuracy and area coverage; Project support capacity; Scheduling and preventive maintenance; Branch separation; Equipment engineering; Range engineering; Operation; Mixed personnel. A discussion is given of existing capacity, required capacity, operating standards and procedures, and measurements modernization program.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 25, 1963
- Accession Number
- AD0658893
Entities
People
- D. D. Steele
- J. F. Reeves
- J. H. Morgan
- J. Smillie