INTERIM METHOD OF ESTIMATING SHIPBOARD STOREROOM REQUIREMENTS (REPAIR PARTS).
Abstract
The proposed interim method of estimating shipboard storeroom requirements (repair parts) is graphically outlined. This method is discussed in order to obtain an understanding of the procedure. The basic method involves: (a) estimating piece count; and (b) from the estimated piece count, estimate storeroom requirements.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 03, 1964
- Accession Number
- AD0659964