PROJECT FAATE, PHASE I, FINAL REPORT.
Abstract
The report consists of three separate parts: Part I contains background information and a summary of the overall program; Part II presents a detailed account of a controlled experiment that was performed to verify the BFIC concept; and Part III exhibits the development of a computer approach used to generate Fault Isolation routines, and the results obtained.
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1967
- Accession Number
- AD0662190
Entities
Organizations
- Westinghouse Electric Corporation