REPORT OF LINAC OPERATION 1 JULY-31 DECEMBER 1967.
Abstract
The operation and use of the NRL 60 MeV Electron Linear Accelerator is described for the period 1 July - 31 December 1967. This period is characterized by increased use, to 1732 hours, by conversion to the Stanford (SLAC) type klystrons, and by installation of higher power, more reliable modulators. Non-Linac Branch users from nine separate groups received 18% of the beam time. Brief progress reports of six Linac Branch experiments are included. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1968
- Accession Number
- AD0667714
Entities
Organizations
- United States Naval Research Laboratory