SPECIALIZED EVALUATIONS OF SHELTER EQUIPMENT AND PROCEDURES.
Abstract
Three series of tests evaluated a ventilation kit, lighting kit, and dual-purpose container for functional adequacy and ease of assembly and operation in simulated fallout shelter environments. The first series of tests used 2-man teams and light and dark conditions, the second series 6-man teams, and the third series 400 people in a 48 hour shelter occupancy. The first and second test series evaluated and revised assembly and operating instructions, and developed shelter manager 'focus aides' to eliminate difficulties discovered. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1968
- Accession Number
- AD0669258
Entities
People
- Harry A. Meier
- Michael W. Gaynor
- Robert W. Smith