PERT AND ITS ASSOCIATED MANAGEMENT SCIENCES

Abstract

The text is an introduction to PERT/TIME and its associated management sciences. The instruction is designed to give executives and project managers a basic understanding and appreciation of PERT. The familiarity acquired from the instructional material will permit the manager to work closely with PERT experts in the development of networks and their interpretation. From the author's experience, few project managers and engineers use a detailed analysis of activity time variances in the course of a project. Therefore, statistical probability theory is eliminated. This text includes basic instruction in project cost optimization within the PERT/TIME work breakdown structure, and therefore should give the manager familiarity with the advantages of PERT/COST. The content of this course may be covered in 12 hours of lecture seminar instruction, with 6 hours of outside work on the part of the participants. If more expertise in a particular area is desired, it is believed that this text will provide a foundation for comprehension of literature in specialized or more advanced areas of PERT systems.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1968
Accession Number
AD0677394

Entities

People

  • M. M. Michie

Tags

Communities of Interest

  • Air Platforms
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Computations
  • Computer Programs
  • Contracts
  • Costs
  • Engineers
  • Instructional Materials
  • Instructions
  • Lead Time
  • Management Personnel
  • Management Planning And Control
  • Materials
  • Personnel Management
  • Pert
  • Procurement
  • Production
  • Scheduling (Production)

Readers

  • Logistics and Supply Chain Management.
  • STEM Education
  • Systems Analysis and Design