DESIGN AND CONSTRUCTION OF THE WEI-RIVER BRIDGE IN WU-LING. A HINGED TEE RIGID-STRUCTURE BRIDGE OF BUILT-UP PRESTRESSED REINFORCED CONCRETE CANTILEVERS.
Abstract
A report is given on the design and construction of the Wei River bridge at Wu-ling, Honan. This bridge is built with prestressed reinforced concrete. It has three spans: the middle span is 50 meters, and the two side spans are 25 meters each. The total length is 105.2 meters. The paper provides extensive data on design, selection of material, construction sequences, and construction techniques.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 08, 1969
- Accession Number
- AD0699233
Entities
Organizations
- National Air and Space Intelligence Center