CORE MANAGEMENT PLAN FOR THE MH-1A

Abstract

This study analyzes the fuel cycle costs of the MH-1A for two core management plans. The calculated cost figures are based on the most current data. Each plan includes the core refueling and cost schedules over the life of the plant. The cost schedules are intended to serve as support data for determining funding requirements. Finally, comparison is made of the two plans with regard to total cost, cost per fiscal year, and cost per kilowatt-hour of electrical energy produced.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 03, 1969
Accession Number
AD0699316

Entities

People

  • Ralph S. Saunders
  • Shrinivas S. Iyer

Tags

DTIC Thesaurus Topics

  • Contracts
  • Control Rods
  • Cost Analysis
  • Costs
  • Electric Power
  • Elements
  • Engineering
  • Engineers
  • Equations
  • Fabrication
  • Government (Foreign)
  • Lead Time
  • Nuclear Reactors
  • Procurement
  • Refueling
  • Scheduling (Production)
  • Time Intervals