SM-1A PRESSURE VESSEL LIFETIME AS RESULT OF IN-PLACE ANNEALING.
Abstract
The report is presented to cover the 'recovery of ductility' of the SM-1A reactor vessel steel as a result of the 'in-place' annealing. It discusses the pre-annealing vessel lifetime, the general annealing techniques used, the surveillance specimen program to evaluate the recovery, the recovery accomplished, and the estimated lifetime of the annealed reactor vessel. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 19, 1969
- Accession Number
- AD0699330
Entities
People
- George W. Knighton