A Proposed Modification to the Criteria for Selecting Critical Items.

Abstract

A mathematical model has been developed for use in selecting items to receive the intensive management of the critical item program. The model has as its objective the minimization of essentiality-weighted NORS (Not Operationally Ready-Supply) downtime, subject to a cost constraint. Under the assumptions used in the model, a solution was obtained which reflects optimal use of funds available for procurement of spares. An empirical test is planned, to test the validity of the model and to make possible a 'calibration' of the scaled factors it introduces. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1970
Accession Number
AD0714069

Entities

People

  • Herman S. Rappaport
  • Irving Katz
  • Layman J. Potter Jr.
  • Victor J. Presutti Jr.

Tags

DTIC Thesaurus Topics

  • Calibration
  • Contract Administration
  • Contracts
  • Downtime
  • Mathematical Models
  • Models
  • Procurement

Readers

  • Computational Modeling and Simulation
  • Logistics and Supply Chain Management.