Design of a Non-RDT+E Systems/Equipments Monitoring System.

Abstract

The specifications for the design of a Non-RDT+E Systems/Equipment (Contractor Furnished Equipments) Identification and Monitoring System are presented. The absence of such a system similar to that in use for identifying systems/equipments in the RDT+E cycle has resulted in contractor furnished equipment being installed on new ships without the Navy being properly prepared for the impact on personnel and training resources. The specifications make provisions for the development of an interim system which can be implemented quickly with a minimum of new reporting requirements or an optimum system which would be more costly but provide more lead time in the identification of emergent contractor furnished equipments. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1970
Accession Number
AD0716413

Entities

People

  • Oliver E. Vroom
  • Robert E. Willis

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Civilian Personnel
  • Contractors
  • Engineers
  • Identification
  • Lead Time
  • Monitoring
  • Scheduling (Production)
  • Specifications
  • Students
  • Time
  • Trainees
  • Training

Readers

  • Aerospace Test and Evaluation
  • Business Analytics
  • Logistics and Supply Chain Management.