Human Factors Engineering Mock-Up Facility.

Abstract

The report is a brief study of the value of a mock-up facility as a management tool. Included is a general discussion for the need of this facility along with area and space requirements, skills and number of personnel required and a budgeting estimate. Also included is a proposed schedule for installation and completion of all areas. (Author)

Document Details

Document Type
Technical Report
Publication Date
May 01, 1970
Accession Number
AD0717026

Entities

People

  • Charles E. Righter

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Biological Sciences
  • Biomedical Engineering
  • Biotechnology
  • Engineering
  • Engineers
  • Human Factors Engineering
  • Human Systems Integration
  • Interdisciplinary Science
  • Personnel Management
  • Systems Engineering
  • Systems Science

Readers

  • Life Cycle Cost Analysis
  • Software Engineering

Technology Areas

  • Space