Landing Control Centrals
Abstract
The procedure provides methods of evaluating the technical performance, engineering adequacy, and technical characteristics of landing control centrals relative to military requirements.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 18, 1969
- Accession Number
- AD0718620
Entities
Organizations
- United States Army Test and Evaluation Command