SANGUINE System Environmental Compatibility Assurance Program (ECAP).
Abstract
The Project SANGUINE environmental compatibility assurance program is described: its goals, work accomplished and results to date are presented. Part 1 is the program overview. The ECAP, the SANGUINE environment, the program status, and future research plans are outlined. Part 2 is a summary of major program areas. Biological and ecological assurance includes pertinent literature, electrical safety, biological and biochemical research, ecological surveys, heart pacer experiments and associated activities. Facilities construction and operation assurance addresses environmental awareness, land acquisition and joint use, installation, land restoration and coordination. Interference mitigation describes interference theories, systems and devices susceptible to extremely low frequency (ELF) interference, interference mitigation thresholds, techniques and practices. Part 3 is a description of the program management. Supporting technical documentation is provided in four appendices. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1970
- Accession Number
- AD0718828
Entities
People
- Richard E. Carlson