Economic Justification of Time of Initial Operations to Consolidate Sandy Areas with Vegetation When Building Railways in Deserts and Semideserts,

Abstract

As a result of technical-economic calculations, the soundness of executing operations to secure sand areas in the preparatory period and not in the basic period simultaneously with building the roadbed has been established. Sand-consolidating operations and sand-protective tree plantings must be included in the preparatory period and this period is singled out for a separate integrated flow. Operations in the preparatory period must be begun 6-12 months after basic operations begin.

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1971
Accession Number
AD0720067

Entities

People

  • R. S. Zakirov

Organizations

  • Cold Regions Research and Engineering Laboratory

Tags

DTIC Thesaurus Topics

  • Agriculture
  • Anatomy
  • Biological Sciences
  • Planting
  • Plants
  • Vegetation

Readers

  • Geotechnical Engineering.
  • Industrial Economics
  • Systems Analysis and Design