Interoceanic Canal Studies - 1970. Annex V. Study of Engineering Feasibility. Volume III. Appendix 9. Modernization and Improvement Plans for Lock Canal; Appendix 10. Route 10 and 14; Appendix 11. Routes 5 and 8.
Abstract
Volume III consists of Modernization and Improvement Plans for Lock Canals and engineering studies of Routes 10 and 14 (Isthmus of Panama Canal and the existing Panama canal and routes 5 and 8 (Nicaragua Lock canal and Nicaragua Costa Rica border region canal). (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1970
- Accession Number
- AD0721170