Guide for Technical Reviews and Audits
Abstract
Provided are joint Procuring Agency-Contractor requirements for the actual conduct of the following technical reviews and audits: System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), Critical Design Review (CDR), Functional Configuration Audit (FCA), Physical Configuration Audit (PCA), Formal Qualification Review (FQR).
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1971
- Accession Number
- AD0723286