Problems in Laying Out Assembly Connections,
Abstract
Problems arising during the construction of connection routes are examined, taking into consideration the requirements of the interference-free feature. The solution is realized in three stages: in the first, circuit routes with powerful signals are traced; in the second, circuit routes with high sensitivity are traced; in the third, the remaining circuit routes are traced. Algorithms for building a minimum connecting tree and for finding the shortest route in the graph were used as the basis for the solution of these problems. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 29, 1971
- Accession Number
- AD0724967
Entities
People
- M. E. Shtein
- V. S. Gaidaienko
Organizations
- National Air and Space Intelligence Center