Project Pre-Gondola II. Structures Instrumentation,
Abstract
The prime objective in the 140 tone row charge cratering experiment was to install and monitor seismic geophones and a hydrophone located at strategic structures for purpose of determining the structure response to the 140 ton detonation.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1968
- Accession Number
- AD0730734
Entities
People
- Robert F. Ballard Jr.