Explosion-Bulge Test Performance of HY-80 Weldments

Abstract

To evaluate weldments made with commercially available welding materials and relatively low welding-heat input, the Mare Island Naval Shipyard prepared submerged-arc weldments for explosion-bulge testing. For comparison purposes MINSY also submitted production-welded specimen weldments prepared by manual metal-arc (Mil-26015 and Mil-11018 electrodes) and inert-gas-shielded metal-arc (Mil-B-88 electrode) welding processes. Test results of six 2-in. thick manual metal-arc (Mil-11018) weldments fabricated by Industrial Testing Laboratory and tested at Naval Proving Ground were also included. These and two automatic submerged-arc welded samples which were laboratory-prepared by an industrial company were tested by explosion-bulge and Charpy V impact test procedures.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1958
Accession Number
AD0730969

Entities

People

  • A. J. Babecki
  • P. P. Puzak

Organizations

  • United States Naval Research Laboratory

Tags

Communities of Interest

  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Arc Welds
  • Blast Testing
  • Chemistry
  • Cold Water
  • Explosive Charges
  • Explosives
  • High Energy
  • Impact Tests
  • Instructions
  • Materials
  • Materials Science
  • Military Research
  • Notch Toughness
  • Resistance
  • Transitions
  • Welding
  • Welds

Fields of Study

  • Materials science

Readers

  • Aerospace Test and Evaluation
  • Metallurgy