Study on the Potential Use of Industrialized Building for the Department of the Army. Volume 2: Narrative
Abstract
The study had six principal goals: (1) To provide background information on the history, characteristics and direction of industralized building; (2) To measure the present capabilities of the industrialized building industry and assess its probable response to programmed military construction; (3) To identify industrialized building systems suitable for employment in the Army's military construction program; (4) To suggest locations most amenable to industrialized building; (5) To identify and discuss possible procurement and implementation procedures; and (6) To provide comparisons between conventional and industrialized construction costs and construction durations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1971
- Accession Number
- AD0732854
Entities
People
- Christopher A. Moyer
- D. G. Bagby
- Robert M. Dinnat
Organizations
- Construction Engineering Research Laboratory