NORSAR (Norwegian Seismic Array). Phase 2. Operation and Maintenance

Abstract

Project NORSAR concerns installation and operation of a large seismic array in S-E Norway. The report covers the operation (on site recording) and maintenance in the field during the period 1 December 1968 through 31 May 1969.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1971
Accession Number
AD0734749

Entities

Organizations

  • Norwegian Defence Research Establishment

Tags

Communities of Interest

  • Human Systems
  • Sensors
  • Space

DTIC Thesaurus Topics

  • Air Force
  • Contractors
  • Contracts
  • Downtime
  • Government Procurement
  • Governments
  • Maintenance
  • Personnel Management
  • Preventive Maintenance
  • Quality Control
  • Recording Systems
  • Seismometers
  • Stations
  • Test Equipment
  • Transportation
  • Vehicles
  • Weather Stations

Readers

  • Aerospace logistics and air mobility.
  • Seismology