The study covers the investigation of the feasibility only of putting a gantry crane on a Lykes Seabee ship for the purpose of unloading containers from a containership tied up alongside. The crane is to have an outreach of at least 50 ft from the side of the ship, but preferably 100 ft. The installation is a temporary one only, and will be removed from the ship after a test program of approximately one weeks duration. There is to be a minimum (preferably none) of disruption or modification to the ship's structure and systems. The crane must also be suitable for installation on a DeLong Type A pier. Tests of the crane on the DeLong pier are scheduled for September, 1972, and on the third Lykes Seabee for January, 1973. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1972
Accession Number
AD0737306

Entities

People

  • Anthony Morse Jr.
  • C. H. Russell

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Ground and Sea Platforms

DTIC Thesaurus Topics

  • Containers
  • Containerships
  • Cranes
  • Gantries
  • Loading (Handling)
  • Materials Handling
  • Ships
  • Unloading

Readers

  • Naval Architecture and Marine Engineering.
  • Systems Analysis and Design