Symposium on Channel Stabilization Problems. Volume 3.
Abstract
;Contents: Channel stabilization, Middle Rio Grande project; Revetment-stabilization of the channel of the Rio Grande from Cabalio Dam to Fort Quitman, New Mexico-Texas; Columbia and Lower Williamette Rivers, 40- by 600-foot project; Columbia river stabilization and improvement for navigation; Bank stabilization, Williamette and Columbia rivers.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1965
- Accession Number
- AD0746965