Portsmouth Naval Shipyard Chamber Modifications. 1971.
Abstract
Extensive modifications to the Navy Experimental Diving Unit Hyperbaric Facility were performed by the Portsmouth New Hampshire Naval Shipyard during 1971. This report describes and documents the modifications which consist of installing penetrators, modifying hatch seals, magnetic particle testing welds and repair welding performed on the pressure hull. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1972
- Accession Number
- AD0748196
Entities
People
- Richard Y. Iha
Organizations
- United States Navy Experimental Diving Unit