Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak.

Abstract

The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 24, 1972
Accession Number
AD0748918

Entities

Organizations

  • Hughes Aircraft Company

Tags

DTIC Thesaurus Topics

  • Contracts
  • End Items
  • Guidance
  • Machines
  • Mechanical Equipment
  • Positioning Devices (Machinery)
  • Qualifications
  • Specifications

Fields of Study

  • Engineering

Readers

  • Logistics and Supply Chain Management.
  • Software Engineering