Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak.
Abstract
The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 24, 1972
- Accession Number
- AD0748918
Entities
Organizations
- Hughes Aircraft Company