Investigation of the Feasibility of the Installation and Removal of the Center Cable in the 25 Ton Collapsible Salvage Pontoon

Abstract

The object of this test is to investigate the general feasibility of removing and installing the center cable on a 25 ton collapsible salvage pontoon.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 18, 1951
Accession Number
AD0755588

Entities

People

  • T. N. Blockwick

Organizations

  • United States Navy Experimental Diving Unit

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Classification
  • Contracts
  • Determinants (Mathematics)
  • Gaskets
  • Mechanical Components
  • Resilience
  • Rubber Gaskets
  • Security

Readers

  • Internal Combustion Engine (ICE) Technology.
  • Maritime Security/Maritime Homeland Security
  • Naval Architecture and Marine Engineering.