System Operation Report.

Abstract

Operation of the complete NORSAR system started in the beginning of 1971, the following completion of electronic equipment installations. This report, covering the period 1 January-30 June 1971 is, accordingly, the first account of operation under assumed 'normal' conditions. Some operational experience had already been gained from interim operation ('Plan D') and successive transfer of subarrays to fully operative status. The period was characterized by testing and running--in of the system. Efforts by NORSAR's regular staff, in cooperation with IBM were concentrated on optimizing the performance by debugging and improvements in the various fields, in particular with programming and optimizing the performance by debugging and improvements in the various field, in particular with programming and field equipment performance. (Author Modified Abstract)

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1972
Accession Number
AD0756847

Entities

Organizations

  • Royal Norwegian Council for Scientific and Industrial Research

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Computer Programming
  • Computing-Related Activities
  • Cooperation
  • Coverings
  • Debugging
  • Electronic Equipment
  • Field Equipment
  • Load Monitoring
  • Portable Equipment
  • Software Development

Readers

  • Seismology
  • Software Engineering
  • Technical Research and Report Writing.

Technology Areas

  • Microelectronics