Test Instrumentation Subsystem Integration Test Program Requirements
Abstract
The report presents the requirements for integration tests which are a part of the design qualification testing of the Test Instrumentation Subsystem (TIS). The tests are termed, 'integration tests', since they will be performed as the individually qualified subcontractor and Boeing manufactured units are integrated in stages to the subsystem. These requirements will also apply to integration tests performed during acceptance tests of operational subsystems. The measure of performance in the majority of tests will be data accuracy and acceptable performance will be based on the accuracies specified in the measurement list. Total subsystem accuracies will be determined by modifying the accuracies obtained in test in such a way as to include transducer and signal source accuracies.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 15, 1963
- Accession Number
- AD0756858
Entities
People
- Y. C. Douglas
Organizations
- Boeing