Test Instrumentation Subsystem Integration Test Program Requirements

Abstract

The report presents the requirements for integration tests which are a part of the design qualification testing of the Test Instrumentation Subsystem (TIS). The tests are termed, 'integration tests', since they will be performed as the individually qualified subcontractor and Boeing manufactured units are integrated in stages to the subsystem. These requirements will also apply to integration tests performed during acceptance tests of operational subsystems. The measure of performance in the majority of tests will be data accuracy and acceptable performance will be based on the accuracies specified in the measurement list. Total subsystem accuracies will be determined by modifying the accuracies obtained in test in such a way as to include transducer and signal source accuracies.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 15, 1963
Accession Number
AD0756858

Entities

People

  • Y. C. Douglas

Organizations

  • Boeing

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Accuracy
  • Airborne
  • Conversion
  • Errors
  • Frequency
  • Frequency Modulation
  • Frequency Response
  • Ground Stations
  • Inertial Navigation
  • Instrumentation
  • Linearity
  • Modulation
  • Probability
  • Recording Systems
  • Stations
  • Tape Recorders
  • Tape Recording

Fields of Study

  • Engineering
  • Physics

Readers

  • Aerospace Test and Evaluation
  • Instructional Design and Training Evaluation.