Test Instrumentation Subsystem (TIS) Integration Test Program Plan. Model No. X-20
Abstract
The report specifies the facilities, services and equipment required to support Data Systems Lab (DSL) integration testing of the airborne Test Instrumentation Subsystem (TSI) with an electrically simulated glider, the PCM and FM ground station and the Test Instrumentation Checkout Set (TICS). General requirements for performance of the tests will define most of the facilities, services and equipment required. Additional requirements are listed under a short description of each test to be performed in the DSL. A summary schedule of testing and support requirements is contained in the final section of this report.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 18, 1963
- Accession Number
- AD0756859
Entities
Organizations
- Boeing