Cost Estimating Relationships for Manufacturing Hardware Cost of Gun/Howitzer Cannons.
Abstract
Cost estimating relationships (CER's) for predicting the in-house manufacturing hardware unit costs for cannons during the early stages of weapon system development are discussed in this study. Physical/Performance characteristics regarded as 'cost drivers', known early in cannon development, were selected as independent variables. Six CER's are presented in order of decreasing 'goodness of fit', and each exhibit a correlation at the one percent level (F-test). (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1972
- Accession Number
- AD0757163
Entities
People
- Gerald W. Kalal