Maintenance Scheduling Limitations

Abstract

The paper discusses maintenance scheduling problems which must be resolved during phase 2 of the STALOG development. Performance measures associated with scheduling are identified as being extremely critical since they must be clearly established prior to developing specific scheduling techniques. A brief review of sequencing techniques allows the reader to visualize how different heuristics might be used in a dispatching model developed for specific applications. Recommendations are tentative since very little research has been conducted on complex problems of this type.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 24, 1973
Accession Number
AD0761494

Entities

People

  • Joseph E. Boyett Jr.

Organizations

  • Air Force Institute of Technology

Tags

Communities of Interest

  • Air Platforms
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Air Force Personnel
  • Aircrafts
  • Assembly
  • Commerce
  • End Items
  • Logistics
  • Maintenance
  • Military Facilities
  • Military Personnel
  • Scheduling (Production)
  • Schools
  • Time Intervals
  • Universities
  • War Colleges
  • Warfare

Readers

  • Operations Research
  • Systems Analysis and Design