Feasibility Demonstration of an Infrared Terminally Guided Submissile.

Abstract

;Contents: Accounting of fabricated hardware; Drawing numerical list and telemetry drawing family tree; Advanced submissile preliminary engineering analysis; List of reports, procedures, and specifications; Parts breakdown list.

Document Details

Document Type
Technical Report
Publication Date
Jul 31, 1973
Accession Number
AD0767259

Tags

DTIC Thesaurus Topics

  • Accounting
  • Business Administration
  • Communication Systems
  • Demonstrations
  • Engineering
  • Specifications
  • Telemetry

Readers

  • Aerospace Test and Evaluation
  • Business Analytics
  • Groundwater Contamination Remediation.