CMP Instructions, Specifications, and Example.

Abstract

The problem was to develop a construction scheduling model for the Army Functional Component System (AFCS) which could be used by engineers in the field, theater-of-operation planners, and base development planners. To fulfill this requirement a Facility Scheduling Model and an Installation Tabulation Model were developed. Also included are instructions for architects and engineers and an example of the model. The Installation Tabulation Model duration was compared with duration derived by the CERL Construction Management Procedure (CMP) Computer Simulation Model. The comparison results in a recommended 1.35 multiplication factor for the Installation Tabulation Model. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1973
Accession Number
AD0768098

Entities

People

  • E. R. Johnson

Organizations

  • Construction Engineering Research Laboratory

Tags

DTIC Thesaurus Topics

  • Computer Simulations
  • Computers
  • Construction
  • Engineers
  • Instructions
  • Multiplication Factor
  • Scheduling (Production)
  • Simulations
  • Simulators
  • Specifications

Readers

  • Business Analytics
  • Computational Modeling and Simulation
  • Facility/Structural Engineering.