Review of the Management Structure and Acquisition Plan of the SANGUINE System.
Abstract
The report reviews recommendations made in an earlier study (LMI Task 69-18) to determine if any changes to those recommendations were advisable or necessary in light of changes in the SANGUINE System and DoD policies since that earlier report was issued. The report concludes that the earlier recommendations should be changed by virtue of funding constraints which have recently been placed on SANGUINE as well as the development of SANGUINE as a project within the Special Communications (SPECOM) Project Office of the Naval Electronic (NAVELEX) Systems Command since the earlier report was issued. The major recommendations which are made relate to the retention by the Navy of the option to break out the facilities portion of SANGUINE for competitive solicitation and award during the production phase and the location of the SANGUINE Project Office within the SPECOM organization of NAVELEX. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1974
- Accession Number
- AD0776257
Entities
Organizations
- LMI