Human Factors Engineering Design of Thermal Bomb Production Line,
Abstract
Human factors analysis of production of 500 lb. thermally protected bombs was conducted. Specific defects in the target production line were identified, and corrective measures were recommended. Several environmental hazards were described, including excessive noise and heat. Problems identified were photographically documented where possible. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1973
- Accession Number
- AD0779829
Entities
People
- Mark S. Sanders