PERT Program Evaluation Research Task.

Abstract

In January 1958, the Program Evaluation Research Task (PERT) was originated in the Special Projects Office (SP) of the Bureau of Ordnance. The project team was directed to the research and development of improved methods for the planning and control of the complex and far-reaching program developing the Fleet Ballistic Missile (FBM). The PERT team included members of SP, the contractor's organization, and Booz, Allen and Hamilton. Phase I report, issued in July 1958, presented the principal theoretical basis of the work and outlined the proposed installation pattern. The report covers Phase II of the project, which has been essentially the development of detail procedures and mechanics, the modification of concept as experience has proved advisable, and the 'prove out' application of the method in several important areas of the FBM program. This application has demonstrated considerable value. As a result, the application of the method to the entire FBM program has been authorized and is proceeding.

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1958
Accession Number
AD0780300

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Ballistic Missiles
  • Bombs
  • Fleet Ballistic Missiles
  • Guided Bombs
  • Guided Weapons
  • Mechanics
  • Munitions
  • Test And Evaluation

Readers

  • Logistics and Supply Chain Management.
  • Technical Research and Report Writing.