On Optimizing Supply Conditions for High Power Pulse Installations,
Abstract
The problem of determining the economically optimal power supply configuration for a high power pulse generator is considered. Two basic designs are discussed; one employing a current regulated converter and a simpler design which uses no stage between the generator and the pulse shaper. The merits of each are theoretically evaluated in light of short term and long term economic considerations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 10, 1974
- Accession Number
- AD0781532
Entities
People
- K. V. Bulgakov
- V. B. Freiman
Organizations
- United States Army Foreign Science and Technology Center