T and E Guidelines ASW Systems

Abstract

Contents: Conceptual phase; validation phase; full-scale engineering development phase; and substantial production/deployment phase.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 02, 1974
Accession Number
AD0784399

Entities

Organizations

  • Office of the Director

Tags

Communities of Interest

  • Ground and Sea Platforms
  • Human Systems
  • Materials and Manufacturing Processes
  • Sensors
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acoustic Detection
  • Acoustic Detectors
  • Acquisition
  • Detection
  • Detectors
  • False Alarms
  • Maintenance
  • Maintenance Personnel
  • Measurement
  • Processing Equipment
  • Signal Generators
  • Simulators
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Towed Bodies
  • Warning Systems