T and E Guidelines for Command and Control Systems

Abstract

Contents: Conceptual phase; validation phase; full-scale engineering development phase; and substantial production/deployment phase.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 02, 1974
Accession Number
AD0784550

Entities

Organizations

  • Office of the Director

Tags

Communities of Interest

  • C4I
  • Human Systems
  • Materials and Manufacturing Processes
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acquisition
  • Command And Control
  • Command And Control Systems
  • Computer Programming
  • Computers
  • Contractors
  • Contracts
  • Control Systems
  • Cost Effectiveness
  • Debugging
  • Failure Mode And Effect Analysis
  • Operating Systems
  • Radar
  • Reliability
  • Test And Evaluation
  • Test Beds
  • Test Facilities

Fields of Study

  • Physics

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control