Comprehensive Survey of Magpie Creek.

Abstract

A comprehensive stream survey was conducted on Magpie Creek which flows through McClellan AFB and carries the effluents of the Base's domestic and industrial waste treatment plants. The stream was characterized from both a biological or qualitative viewpoint, and a chemical or quantitative viewpoint. The effluents from both the domestic and industrial plants were characterized and performance specifications are proposed for both plants. (Author)

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1973
Accession Number
AD0784819

Entities

People

  • Chester F. Pauls
  • Thomas R. Doane

Tags

DTIC Thesaurus Topics

  • Domestic
  • Health
  • Health Care
  • Industrial Plants
  • Medical Specialties
  • Public Health
  • Specifications
  • Waste Products
  • Waste Treatment

Readers

  • Environmental Engineering
  • Environmental Remediation and Restoration.
  • Systems Analysis and Design