An Advanced Air Traffic Management Concept Based on Extensions of the Upgraded Third Generation ATC System. System B: General Requirements Specification.

Abstract

The document is a preliminary outline for conducting a study of competing air traffic control systems for the 1990 era. The ground rules for comparing two system approaches are given with an emphasis on maintaining common assumptions with respect to air traffic demand, airport development, controller workload, automation levels, and the system elements already in place in 1982. The preliminary nature of the document is emphasized as a number of modifications were found to be necessary during the conduct of the study. (Author)

Document Details

Document Type
Technical Report
Publication Date
Feb 01, 1974
Accession Number
AD0785264

Entities

People

  • A. L. Haines
  • D. Goldman
  • R. M. Harris
  • R. R. Iyer
  • V. P. Gupta

Organizations

  • MITRE Corporation

Tags

DTIC Thesaurus Topics

  • Adaptive Control Systems
  • Adaptive Systems
  • Air Traffic
  • Air Traffic Control Systems
  • Airports
  • Automation
  • Control Systems
  • Demographic Cohorts
  • Radar Landing Control
  • Specifications
  • Traffic
  • Workload

Readers

  • Aviation Safety and Air Traffic Management
  • Systems Analysis and Design