Buoy 2A Inspection Report,

Abstract

The report contains the results of an engineering inspection performed on the U.S. Coast Guard large navigation buoy 2A in September 1968. The large navigation buoy was placed on station in July 1967 off Sandy Hook, N.J. The buoy has been in continuous service since then except during periods of refueling and equipment additions. This inspection and report was requested by U.S. Coast Guard Headquarters to determine the cause of certain problems associated with the energy conversion system on the buoy. (Author)

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1968
Accession Number
AD0786401

Entities

People

  • E. Joseph
  • J. Brzychy
  • W. Sullivan

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Coast Guard
  • Conversion
  • Energy
  • Energy Conversion
  • Engineering
  • Inspection
  • Military Equipment
  • Navigation
  • Refueling

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Maritime Security/Maritime Homeland Security