NOTS PARTICIPATION IN SEALAB 2 PROJECT

Abstract

For the SEALAB II project, the U. S. Naval Ordnance Test Station was assigned responsibility for all surface operational support. The underwater site was selected in cooperation with the Scripps Institution of Oceanography. A staging area was established at the Long Beach Naval Shipyard and a staging vessel was provided and modified to meet the needs of the program. Complete system integration and checkout were performed. All necessary operational support, personnel, equipment, and material were supplied.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1966
Accession Number
AD0800295

Entities

People

  • E. P. Carpenter

Organizations

  • Naval Air Weapons Station China Lake

Tags

Communities of Interest

  • Biomedical
  • Energy and Power Technologies
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Cameras
  • Decompression Chambers
  • Divers
  • Electronic Equipment
  • Fetus
  • Fish
  • Gases
  • Governments
  • Motion Picture Cameras
  • Navy
  • Personnel Management
  • Photographs
  • Photography
  • Radio Communications
  • Recording Systems
  • Seabed
  • Test And Evaluation

Fields of Study

  • Environmental science

Readers

  • Aerospace Test and Evaluation
  • Naval Architecture and Marine Engineering.
  • Underwater engineering and Marine Technology.