Z(PROGRAM 461)ZPRODUCT ASSURANCE.

Abstract

The effects of the redirection to the RTS-1 program were evaluated, and a new Product Assurance Program Plan was drafted. While this plan is being finalized, new directions are being issued to support organizations to permit the realigned effort to proceed in order to meet flight schedule commitments. The lack of a negotiated Statement of Work for the RTS-1 design is causing considerable uncertainty regarding scope, depth, and schedule of the Product Assurance Program.

Document Details

Document Type
Technical Report
Publication Date
Jan 15, 1964
Accession Number
AD0800552

Entities

Organizations

  • Lockheed Martin Missiles and Space

Tags

Readers

  • Defense Technology Research and Development.
  • Software Engineering
  • Systems Analysis and Design