SNAP-50/SPUR.

Abstract

The objectives of the present program are to continue the study, experimental and development programs for the a-c generator and its controls. Major generator development tasks consisted of: (1) generator bore seal development, (2) generator stator development, (3) generator rotor development, and (4) full scale, 467 kva generator development.

Document Details

Document Type
Technical Report
Publication Date
Jul 15, 1966
Accession Number
AD0801347

Entities

People

  • A. E. King
  • C. M. Gauthier
  • D. R. Basel
  • J. G. Hoop
  • R. W. Briggs

Organizations

  • Westinghouse Electric Corporation

Tags

DTIC Thesaurus Topics

  • Generators

Readers

  • Electrical Engineering
  • Software Engineering